TEIs Rel-19

 RAN1#118-bis

9.133   TEI

R1-2409228         Session notes for 9.13 (TEI19)       Ad-Hoc Chair (CMCC)

Friday decision: The session notes are endorsed and contents reflected below.

 

[118bis-R19-TEI] – Haruhi (NTT DOCOMO)

Email discussion on Rel-19 TEI proposals

-        To be used for sharing updates on online/offline schedule, details on what is to be discussed in online/offline sessions, tdoc number of the moderator summary for online session, etc

 

R1-2407811         On Rel-19 TEI proposals   ZTE Corporation, Sanechips

R1-2407884         Rel-19 TEI proposals        vivo

R1-2408177         Enhancement of positioning SRS beam configuration Huawei, HiSilicon, China Unicom, ZTE, Sanechips

R1-2408366         Link adaptation TEI-19      Ericsson

R1-2408493         Rel-19 TEI proposal on remaining ambiguities with SRS carrier switching             Apple

R1-2409075         CSI Acquisition Improvement for Type-II codebook  Orange, ZTE, BT              (rev of R1-2408590)

R1-2408873         Rel-19 TEI proposals        Qualcomm Incorporated

R1-2408958         Proposals for TEI19           Nokia

 

R1-2409094         FL Summary #1 on Rel-19 TEIs   Moderator (NTT DOCOMO)

From Tuesday session

·       For MIMO in R1-2409094: TEI Proposal 7, TEI Proposal 16-1

·       For Non-MIMO in R1-2409094: TEI Proposal 1, TEI Proposal 6, TEI Proposal 10

 

R1-2409210         FL Summary #2 on Rel-19 TEIs   Moderator (NTT DOCOMO, INC.)

From Thursday session

Agreement

For the indication of whether a UE can simultaneously perform SRS carrier switches

 

Agreement

Support a maximum of 32 HARQ process numbers for TN in FR1 and FR2-1 in Rel-19.

·       Introduce new UE capabilities, by duplicating the Rel-17 UE FGs 24-8/24-9 defined for FR2-2 to FR1 and FR2-1.

o   The reporting granularity of the UE capabilities is changed to ‘per FSPC’.

·       Introduce new RRC parameters, harq-ProcessNumberSizeDCI-0-1-Ext-r19, harq-ProcessNumberSizeDCI-1-1-Ext-r19, harq-ProcessNumberSizeDCI-0-2-Ext-r19, harq-ProcessNumberSizeDCI-1-2-Ext-r19, harq-ProcessNumberSizeDCI-0-3-Ext-r19, harq-ProcessNumberSizeDCI-1-3-Ext-r19.

·       For FR1, the above downlink related parameters can only be configured when the maximum number of layers configured for PDSCH is up to 4.

·       For FR1, the above uplink related parameters can only be configured when the maximum number of layers configured for PUSCH is up to 4.

 

Final summary in R1-2409296.


 RAN1#119

9.133   TEI

R1-2410850         Session notes for 9.13 (TEI19)       Ad-Hoc Chair (CMCC)

Friday decision: The session notes are endorsed and contents reflected below.

 

[119-R19-TEI] – Haruhi (NTT DOCOMO)

Email discussion on Rel-19 TEI proposals

-        To be used for sharing updates on online/offline schedule, details on what is to be discussed in online/offline sessions, tdoc number of the moderator summary for online session, etc

 

R1-2409401         Enhancement of SRS beamforming for FR2 positioning              Huawei, HiSilicon, China Unicom, ZTE, Sanechips, CATT

R1-2409542         On Rel-19 TEI proposals   ZTE Corporation, Sanechips

R1-2409990         TEI-19 proposal on link adaptation enhancement        Ericsson

R1-2410246         CSI Acquisition Improvement for Type-II codebook  Orange, ZTE, BT

R1-2410624         TEI19: Counting of active NZP-CSI-RS resources      Nokia, Apple, Ericsson, MediaTek, NTT DOCOMO, Spreadtrum

 

R1-2410813         FL Summary #1 on Rel-19 TEIs   Moderator (NTT DOCOMO, INC.)

From Tuesday session

Agreement

For up to 32 HARQ process numbers for TN in FR1 and FR2-1,

 

 

R1-2410830         FL Summary #2 on Rel-19 TEIs   Moderator (NTT DOCOMO, INC.)

Presented in Wednesday session.

The other proposals require further work. To be checked in future meetings.

 

 

R1-2410891         FL Summary #3 on Rel-19 TEIs      Moderator (NTT DOCOMO, INC.)


 RAN1#120

9.144   TEI

R1-2501553         Session notes for 9.14 (TEI19)       Ad-Hoc Chair (CMCC)

Friday decision: The session notes are endorsed and contents reflected below.

 

[120-R19-TEI] – Haruhi (NTT DOCOMO)

Email discussion on Rel-19 TEI proposals

-        To be used for sharing updates on online/offline schedule, details on what is to be discussed in online/offline sessions, tdoc number of the moderator summary for online session, etc

 

R1-2501418         Enhancement of CDM DMRS port allocation combinations for enhanced uplink and downlink performance Tejas Network Limited      (rev of R1-2500499)

R1-2500579         Rel-19 TEI on UE frequency hopping for positioning ZTE Corporation, Sanechips

R1-2500615         On TEI-19            Ericsson

R1-2500809         Rel-19 TEI proposal on remaining ambiguities with SRS carrier switching             Apple

R1-2501034         Proposals for TEI19           MediaTek Inc.

R1-2501180         TEI proposal on SR triggered SSSG fallback Qualcomm Incorporated

R1-2501284         TEI19: Counting of active NZP-CSI-RS resources      Nokia, Apple, Ericsson, MediaTek, NTT DOCOMO, Spreadtrum

R1-2501323         Enhancement of SRS beamforming for FR2 positioning              Huawei, HiSilicon, China Unicom, ZTE, Sanechips, CATT

 

R1-2501464         FL Summary #1 on Rel-19 TEIs   Moderator (NTT DOCOMO, INC.)

From Tuesday session

Agreement

·       Extend Rel-18’s UL frequency hopping UL SRS for positioning transmission to non-RedCap UEs in a single carrier

·       UE capability for non-RedCap UEs for UL SRS frequency hopping for positioning transmission

Send LS to RAN2 to inform this agreement, whether new parameter is needed is up to RAN2 discussion.

 

 

R1-2501534         FL Summary #2 on Rel-19 TEIs   Moderator (NTT DOCOMO, INC.)

From Wednesday session

Agreement

·       If a UE is instructed to monitor PDCCH according to search space sets with a group index other than a designated index, the UE stops PDCCH monitoring according to search space sets with the group index and start PDCCH monitoring according to search space sets with the designated group index from the first slot that is at least P_switch symbols after the last symbol of a PUCCH carrying an SR.

·       Introduce corresponding UE capability and RRC parameters to enable/disable the above feature and indicate the designated SSSG index.

·       Send LS to RAN2 to inform above agreement and ask for the support of the UE capability and the corresponding RRC parameters.

 

R1-2501562         FL Summary #3 on Rel-19 TEIs   Moderator (NTT DOCOMO, INC.)

From Thursday session

R1-2501539         Draft LS on non-RedCap UE UL SRS frequency hopping for positioning          ZTE Corporation, Sanechips

Decision: The draft LS to RAN2 is endorsed with following information:

In RAN1#120 meeting TEI agenda, RAN1 has made the following agreement for enabling non-RedCap UE performing UL SRS frequency hopping for positioning:

Agreement

Ÿ   Extend Rel-18’s UL frequency hopping UL SRS for positioning transmission to non-RedCap UEs in a single carrier

Ÿ   UE capability for non-RedCap UEs for UL SRS frequency hopping for positioning transmission

Send LS to RAN2 to inform this agreement, whether new parameter is needed is up to RAN2 discussion.

As this agreement may relate to RAN2 specification, this liaison informs RAN2 about this agreement and whether new parameter for non-RedCap UE UL frequency hopping is needed is up to RAN2 discussion.

To RAN2

ACTION: RAN1 respectfully asks RAN2 to take the agreement into account in their Rel-19 specification, and feedback if there is any spec impact.

Final LS is approved in R1-2501573.

 

Agreement

To resolve ambiguities with concurrent configuration of SRS-CS and ulTxswitch in a case where a UE configured with SRS CS on target CC and its “switch-from” CC on CC2 and configured with UL Tx switching operation for UL CC2 and at least one UL CC1 

·       Confirm that the prioritization rules in 38.214 Sec. 6.2.1.3 are applied between target and CC1, regardless of SRS-AS antenna port configuration on target CC, if UE indicates based on srs-SwitchingAffectedBandsListNR-r17 that SRS-CS on target impacts CC1, where CC1 is one of the CC(s) which may share Tx chains with source CC. No spec change is needed.

o   Note: if UE does not indicate srs-SwitchingAffectedBandsListNR-r17, UE can only perform simultaneous transmission when the total number of involved Tx chains for simultaneous transmission on all the bands/carriers is not greater than number of Tx chains supported by the UE for simultaneous UL transmission. No spec change is needed. 

·       If the UE is under the operation state in which all Tx chains are available at the source CC, the required switching time before the beginning of SRS-CS transmission on target CC is SRS-SwitchingTimeNR. Otherwise, the required switching time before the beginning of SRS-CS transmission on target CC is indicated by a UE capability. Details about UE capability will be discussed in UE feature session.

·       The existing scheduling restriction of maximum one switching per reference slot for UL Tx switching is also taking into account the triggered SRS CS.

·       After SRS transmissions within an SRS resource set is done, if UE is indicated to transmit on CC1, the required switching time between the end of SRS-CS transmission on target CC and start of UL transmission on CC1 is indicated by the UE capability defined above. Otherwise, it is assumed for the determination of any future switching time that all Tx chains are returned to the source CC, and the RF tuning time to switch from target to source will be SRS-SwitchingTimeNR.

 

Final summary in R1-2501598.


 RAN1#120-bis

9.144   TEI

R1-2503118        Session notes for 9.14 (TEI19)      Ad-Hoc Chair (CMCC)

Friday decision: The session notes are endorsed and contents reflected below.

 

[120bis-R19-TEI] – Haruhi (NTT DOCOMO)

Email discussion on Rel-19 TEI proposals

-        To be used for sharing updates on online/offline schedule, details on what is to be discussed in online/offline sessions, tdoc number of the moderator summary for online session, etc

 

R1-2501787         On Rel-19 TEI proposals  ZTE Corporation, Sanechips

R1-2502995         Rel-19 TEI on muting of always-on signals for 5G Broadcast  EBU       (rev of R1-2502550)

R1-2502638         Higher layer parameters for Rel-19 TEI SRSCS_ULTxSwitch Apple

R1-2502722         Proposal for TEI19            MediaTek Inc.

R1-2502748         Enhancement of SRS antenna switching pattern reporting        CATT

R1-2503073         Proposal for Rel-19 RAN1 TEI        Qualcomm, Apple, Verizon, ZTE    (rev of R1-2502862)

 

R1-2503009        FL Summary #1 on Rel-19 TEIs  Moderator (NTT DOCOMO, INC.)

Presented in Monday session

 

R1-2503010        FL Summary #2 on Rel-19 TEIs  Moderator (NTT DOCOMO, INC.)

From Wednesday session

Agreement

For simultaneous CSI-RS reception in UE features 2-33, 2-36, 2-40, 2-41, 2-43, 16-3a and 16-3b, define 1 new UE capability:

·        UE capability 1: To allow the UE to indicate that CSI-RS ports within one periodic/semi-persistent CSI-RS resource, as well as the periodic/semi-persistent CSI-RS resource, are counted as one resource, even if the periodic/semi-persistent CSI-RS resource is referred by N Report Settings.

Agreement

The non-MBSFN subframes containing the cell acquisition signals (PSS/SSS/PBCH/SIB1) in an MBMS-dedicated cell shall only be transmitted within the first (k×40) ms out of every (n×160) ms.

·        Introduce a new parameter n, to be configured for support MBMS, from the set {2,4,8,16}.

·        Introduce a new parameter k, to be configured for support MBMS, from the set {4,5,6,7,…,63}.

·        In the absence of the above parameters {n,k}, all non-MBSFN subframes containing cell acquisition signals in an MBMS-dedicated cell shall be transmitted.

NOTE: For a MBMS-dedicated cell, there is no RAN4 impact from the above TEI proposal.

 

Agreement

Adopt the following TP to Section 6.2.1.4.1, TS 38.214.

6.2.1.4.1  SRS frequency hopping for positioning

<Unchanged parts are omitted>

For operation in the same carrier, the reduced capability UE is not expected to be activated or triggered to transmit SRS on overlapping symbols with a SRS resource of the transmit frequency hopping configured by the higher layer parameter SRS-PosTx-Hopping including the switching time to or from the active bandwidth part and a SRS resource with resourceType of both SRS resources as 'semi-persistent' or 'aperiodic'.

A UE shall perform SRS frequency hopping for positioning according to clause 6.2.1.4.1, subject to UE capability, with the following modifications:

           “reduced capability UE” is replaced by “UE”

           The reduced capability UE transmit frequency hopping is configured within one SRS resource for positioning in higher layer parameter srs-PosConfig, that may be configured with a bandwidth larger than the maximum bandwidth of the reduced capability UE” is replaced by “The UE transmit frequency hopping is configured within one SRS resource for positioning in higher layer parameter srs-PosConfig”.

 

Agreement

Adopt the following TPs to TS 38.212.

7.3.1.1.2  Format 0_1

<Unchanged parts are omitted>

-       HARQ process number - 5 bits if higher layer parameter harq-ProcessNumberSizeDCI-0-1 or harq-ProcessNumberSizeDCI-0-1-Ext-r19 is configured; otherwise 4 bits

<Unchanged parts are omitted>

7.3.1.1.3  Format 0_2

<Unchanged parts are omitted>

-       HARQ process number - number of bits determined by the following:

-  5 bits determined by higher layer parameter harq-ProcessNumberSizeDCI-0-2-v1700 if configured;

-    0, 1, 2, 3, 4 or 5 bits determined by higher layer parameter harq-ProcessNumberSizeDCI-0-2-Ext-r19 if configured;

-  otherwise 0, 1, 2, 3 or 4 bits determined by higher layer parameter harq-ProcessNumberSizeDCI-0-2

<Unchanged parts are omitted>

7.3.1.1.4  Format 0_3

<Unchanged parts are omitted>

-       HARQ process number - number of bits determined by the following:

-  block number 1, block number 2,…, block number

Each block corresponds to the HARQ process number for a cell, and the blocks are placed according to an ascending order of a serving cell index, with block number 1 corresponding to the HARQ process number for the cell with the smallest serving cell index. Each block is 0, 1, 2, 3, 4 or 5 bits determined by higher layer parameter harq-ProcessNumberSizeDCI-0-3 or harq-ProcessNumberSizeDCI-0-3-Ext-r19 configured for the cell corresponding to the block.

<Unchanged parts are omitted>

7.3.1.2.2  Format 1_1

<Unchanged parts are omitted>

-       HARQ process number - 5 bits if higher layer parameter harq-ProcessNumberSizeDCI-1-1 or harq-ProcessNumberSizeDCI-1-1-Ext-r19 is configured; otherwise 4 bits

<Unchanged parts are omitted>

7.3.1.2.3  Format 1_2

<Unchanged parts are omitted>

-       HARQ process number - number of bits determined by the following:

-  0, 1, 2, 3, 4 or 5 bits determined by higher layer parameter harq-ProcessNumberSizeDCI-1-2-v1700 or harq-ProcessNumberSizeDCI-1-2-Ext-r19 if configured;

-  otherwise 0, 1, 2, 3 or 4 bits determined by higher layer parameter harq-ProcessNumberSizeDCI-1-2

<Unchanged parts are omitted>

7.3.1.2.4  Format 1_3

<Unchanged parts are omitted>

-       HARQ process number - number of bits determined by the following:

-  block number 1, block number 2,…, block number  

Each block corresponds to the HARQ process number for a cell, and the blocks are placed according to an ascending order of a serving cell index, with block number 1 corresponding to the HARQ process number for the cell with the smallest serving cell index. Each block is 0, 1, 2, 3, 4 or 5 bits determined by higher layer parameter harq-ProcessNumberSizeDCI-1-3 or harq-ProcessNumberSizeDCI-1-3-Ext-r19 configured for the cell corresponding to the block.

<Unchanged parts are omitted>

 

 

Final summary in R1-2503095.


 RAN1#121

9.144   TEI

 

R1-2504900            Session notes for 9.14 (TEI19)               Ad-Hoc Chair (CMCC)

Endorsed.

 

 

R1-2504949            Summary #4 of Discussion on RAN4 LS on UL Tx switching for TEI19                 Moderator (MediaTek)

Proposal 1-C without cyan part in R1-2504949 to accommodate RAN4 TEI request for scenario 1 is objected by Huawei.

 

 

 

[121-R19-TEI] Email discussion on Rel-19 TEI proposals – Haruhi (DOCOMO)

-        To be used for sharing updates on online/offline schedule, details on what is to be discussed in online/offline sessions, tdoc number of the moderator summary for online session, etc

 

 

R1-2503590            Views on Rel-19 TEI              Samsung

R1-2503675            On Rel-19 TEI proposals       ZTE Corporation, Sanechips

R1-2503767            Rel-19 TEI on SRS antenna switching pattern report            CATT, MediaTek Inc.

R1-2504276            Proposal for TEI19 MediaTek Inc., Nokia, Apple, Ericsson, NTT DOCOMO, Orange

R1-2504290            On muting cell acquisition signals in MBMS-dedicated cell Huawei, HiSilicon

R1-2504351            On Rel-19 RAN1 TEI             Apple

R1-2504418            Rel-19 RAN1 TEI proposal   Qualcomm Incorporated

R1-2504442            On TEI-19               Ericsson

R1-2504521            FL Summary #1 on Rel-19 TEIs            Moderator (NTT DOCOMO, INC.)

R1-2504522            FL Summary #2 on Rel-19 TEIs            Moderator (NTT DOCOMO, INC.)

R1-2504653            Higher layer parameters for Rel-19 TEI_5GB_CAS_Muting after RAN1#120bis                 EBU